Police Security Dover 1000 Lumen Rechargeable Flashlight – USB-C Charging Cable Included, Slide Focus, 6-Hour Runtime, Impact Resistant – w/Belt Clip.

★★★★★ 4.3 69 reviews

US$13.20
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by ygeos.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$13.20
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Oct 22
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by ygeos.com
Free 30-day returns Details

Product details

Management number 210379582 Release Date 2026/04/02 List Price US$13.20 Model Number 210379582
Category

Police Security’s Dover rechargeable, 800 lumen LED flashlight, is optimal for automotive technicians and other professionals who demand long-term flashlight performance. With our Quik Connect USB charging system (cable included), this light functions with a 18650 rechargeable lithium-ion battery delivering up to 11 hours runtime. With high, low, flash modes and slide focus, this flashlight is immediately adaptable to a variety of situations.

  • Ultra-Bright Performance: Delivers a powerful 1000 lumens with a beam distance of up to 210 meters—ideal for mechanics, automotive work, and emergency situations.
  • Long-Lasting & Rechargeable: Equipped with a high-capacity 18650 2600mAh lithium-ion battery for up to 6 hours of runtime on Low mode. Rechargeable via included USB-C cable.
  • Versatile Lighting Modes: Features 3 adaptable settings—High (1000 lm), Low (250 lm), and Flash—for various lighting needs, plus Slide Focus for adjustable beam control.
  • Durable & Portable: Impact resistant with a compact 6.65" body and integrated belt clip for easy everyday carry. Built to handle tough work environments.
  • No stand alone batteries are sold with this product
UPC 704673982952
Shape Cylindrical
Runtime 6 hours
Brand Name Police Security
Style Name Tactical
Unit Count 1.0 Count
Battery Type Lithium Ion
Finish Types Anodized Aluminum
Manufacturer Police Security Flashlights
Model Number 98295
Power Source Battery Powered
Material Type Aluminum
Warranty Type Limited. Police Security Flashlights stands behind its products with a limited lifetime manufacturer’s warranty. Any item that does not perform properly due to a manufacturer defect can be returned for a warranty replacement. Warranty does not cover normal wear and tear, nor damage resulting from neglect or misuse. Damage caused by battery corrosion is not covered by warranty.
Item Type Name Police Security 98295 Dover Rechargeable LED Flashlight 800 Lumens
White Brightness 1000 Lumens
Light Source Type LED
Additional Features Rechargeable
Battery Description Lithium-Ion
Included Components Battery
Light Path Distance 210 Meters
Number of Batteries 1 Lithium Ion batteries required. (included)
Batteries are Included Yes
Water Resistance Level Water Resistant
Number of Light Sources 1
Item Dimensions D x W x H 3"D x 2"W x 10"H
Item Dimensions L x W x H 1.02"L x 1.02"W x 6.75"H
Light Source Special Features Beam Distance: 210 meters, Lighting Modes: High, Low, Flash, Slide Focus
Manufacturer Warranty Description police security stands behind its products with a lifetime limited manufacturer's warranty. Any item that does not perform properly due to a manufacturer defect can be returned for a warranty replacement. Warranty does not cover normal wear and tear, nor damage resulting from neglect or misuse. Batteries are not covered by warranty.

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.3 out of 5
★★★★★
69 ratings | 28 reviews
How item rating is calculated
View all reviews
5 stars
80% (55)
4 stars
6% (4)
3 stars
3% (2)
2 stars
1% (1)
1 star
10% (7)
Sort by

There are currently no written reviews for this product.